Habitat for Humanity

Posted on: May 11th, 2015 by Drake Construction

Scope of Work: Clearing of 3.4 Acres, Staking & Layout, Stripping of Topsoil, Building Pad – Import 42″ Sect Fill with 5′ Overbuild, Fine grade Paving Sub-grade, Stabilize with 6% Lime, rough grade Sidewalks and Misc. Flatwork, Backfill all Greenbelt areas after concrete is poured.

Address: 9407 SH 242, Conroe, TX 77385

General Contractor: SLI Construction  http://www.sligroup.com/

Date Started: 5/4/2015

Work Duration: 1 Month

 