Drake Construction Projects

Klein ISD Agri-Science Facility

Posted on: June 10th, 2013 by Drake Construction

Scope of Work: To provide all labor, materials, and equipment necessary to perform all of the site demolition, detention pond and barn addition dirt work, swale work, storm sewer system, and lift station.  Detention Pond size – 0.9 Acres, clearing of trees and underbrush, excavate and grade, fine grade and compact, install riprap extreme overflow.  Use dirt from the detention pond to raise the 6 barn addition pad locations, fine grade and compact.  Storm system consisted of 64′ – 18″ HDPE, 164′ – 2″ Force Main, 5 – Headwalls, and 13′ Deep Lift Station.

Address: 6747 Klein Cemetary Rd., Klein, TX 77379
General Contractor: DT Construction http://dt-construction.com
Date Started: 6/10/2013
Work Duration: 1 Month

Klein 4 Klein 5 Klein 6 Klein 3 Klein 2 Klein 1

Willis Fire Station # 94

Posted on: March 18th, 2013 by Drake Construction

Scope of Work: Staking & Layout, Stripping of Topsoil – 1.5 Acres, Storm Drainage at Entrance (70’ – 18” RCP, 2 – Safety End Treatments), Cut, Proof Roll, Select Fill Placement for Building Pad, Stabilization of Paving Subgrade, Grade for Sidewalks and Misc. Flatwork, Backfill in all Greenbelt areas

Address: 13701 FM 1097, Willis, TX 77318
General Contractor: LDF Construction. http://ldfconstruction.com
Date Started: 3/18/2013
Work Duration: 2 Weeks

 

0  1 2 3 4 5 6 7 8 12 9 10 11  imag011

Rosenberg Fire Station # 3

Posted on: February 6th, 2013 by Drake Construction

Scope of Work: Staking & Layout, Stripping of Topsoil – 2.01 Acres, Storm Pipe System (340’ – 24” HDPE, 600’ – 12” HDPE, 4 – Type A Inlets, 1 – Curb Inlet), Proof Roll, Select Fill Placement for Building Pad, Stabilization of Paving Subgrade, Grade for Sidewalks and Misc. Flatwork, Backfill in all Greenbelt areas.

Address: 1102 FM 2977 Rd, Richmond, TX 77469
General Contractor: LDF Construction, http://ldfconstruction.com
Date Started: 1/27/2013
Work Duration: 4 Weeks

Forest Island Water Park

Posted on: January 6th, 2013 by Drake Construction

Scope of Work: Clearing of Trees and Brush, Staking & Layout, Stripping of Topsoil – 1.1 Acres, Excavate & Backfill for Slide Tower Basement, Cut/Fill/Fine grade for Arrival Building, Storm Pipe System (460’ – 6” SCH40 PVC Pipe, 380’ – 4” SCH40 PVC Pipe)

Address: 4665 Woodforest Pkwy. North, Montgomery, TX 77316
General Contractor: LDF Construction, http://ldfconstruction.com
Date Started:1/01/2013
Work Duration: 3 Weeks

 

 

 

IMG_20130328_144423_627 IMG_20130328_144439_207 IMG_20130328_145151_252 IMG_20130328_150831_116 IMG_20130509_145639_386 IMG_20130417_113727_808 IMG_20130417_113720_321 WP2 WP1 WP3

 

First Bank of Conroe

Posted on: December 6th, 2012 by Drake Construction

Scope of Work: Clearing of Trees and Brush – 1.8 Acres, Demolition of Existing Asphalt Driveway and Carports, Staking & Layout, , Storm Pipe System (18” HDPE, 12” HDPE), Proof Roll, Excavation of Retention Pond, Select Fill Placement for Building Pad, Stabilization of Paving Subgrade, Grade for Sidewalks and Misc. Flatwork, Backfill in all Greenbelt areas.

Address: 6311 FM 1488 Rd, Magnolia, TX 77354
General Contractor: Huffco Services Inc., http://www.huffcoservices.com/
Date Started: 12/05/2012
Work Duration: 4 Weeks

Dr. Leiker Dental Office Building

Posted on: October 16th, 2012 by Drake Construction

Scope of Work: Clearing of Trees and Brush – 0.53 Acres, Stripping of Topsoil, Staking & Layout, Storm Pipe System (200’ – 30” RCP, 64’ – 24” RCP, 128’ – 18” RCP, 2 – Junction Boxes, 2 – Type A Inlets, Safety End Treatments, Rip Rap), 3,950 SF Building Pad, Stabilization of Paving Subgrade, Grade for Sidewalks and Misc. Flatwork, Backfill in all Greenbelt areas

Address: 4000 S. Panther Creek Dr., The Woodlands, TX 77381
General Contractor: LDF Construction, http://ldfconstruction.com
Date Started: 10/15/2012
Work Duration: 3 Weeks