Scope of Work: Clear and grub all disturbed areas, Excavate & Grade Detention Pond, approximately 7,500 Cubic Yards of Cut, removal of 5,000 cubic yards from site, furnish and install protective riprap, hydro-mulch all disturbed areas on the site, provide and install pond outfall including 18″ RCP culvert and concrete interlocking block, furnish and install 390 LF – 36″ HDPE Storm Pipe, and tie into existing Inlet.
Address: The Estates of Wedgewood Falls, Conroe, TX
General Contractor: Bleyl & Associates, http://www.bleylengineering.com/
Date Started: 12/12/2013
Work Duration: 5 weeks