World Champions Centre

Posted on: June 24th, 2014 by Chris Drake Construction

Scope of Work: Strip to six inches of topsoil from site (4.07 Acres), Import Select Fill for 49,695 SF Building Pad ( Minimum 24″ w/ 3′ Overbuild), Grade paving subgrade and stabilize, rough grade sidewalks, and backfill greenbelt areas after paving and curbs are poured.

Address: 28865 Birnham Woods Dr, Spring, TX

General Contractor: LDF Construction, http://ldfconstruction.com

Date Started: 6/24/2014

Work Duration:  3 months, *delayed due to re-engineering

 

IMG_20140716_150437605  IMG_20140722_082605831 IMG_20140721_075538262 IMG_20140716_150539272  11046416_816519318432370_2168780880034711589_n IMG_20150226_081021624 10429843_805518529532449_4945336570433080397_n 11071119_805518649532437_5066225769715203234_n 11150540_816519245099044_1706646752163538849_n 11146292_816519385099030_1826514864697633430_n 11096464_816519278432374_1451405750471365245_n 11102692_816518828432419_6975997861864474391_n 11137097_816518808432421_5824798728931537761_n 11150822_816518965099072_5787818595077478970_n